Old 08-17-2016, 03:37 PM   #1
Fire21
Station Master
 
Join Date: Mar 2014
Location: Wyoming, USA
Posts: 2,736
Scales Modeled: N-Scale.
PTC is hit or miss so far

RAILROADS SHOW LITTLE PROGRESS ON KEY SAFETY TECHNOLOGY
08/17/2016
By JOAN LOWY

WASHINGTON (AP) — Many commuter and freight railroads have made little progress installing safety technology designed to prevent deadly collisions and derailments despite a mandate from Congress, according to a government report released Wednesday.

The technology, called positive train control or PTC, uses digital radio communications, GPS and signals alongside tracks to monitor train positions. It can automatically stop or slow trains to prevent them from disobeying signals, derailing due to excessive speed, colliding with another train or entering track that is off-limits.

The Federal Railroad Administration report shows that while some railroads have made substantial progress, others have yet to equip a single locomotive or track segment with the technology, or install a single radio tower.

Congress passed a law in 2008 giving railroads seven years to put the technology in place, and last year extended that deadline for three more years after railroads said they were unable to meet the first deadline. The law extending the deadline to Dec. 31, 2018, also allows the railroad administration to grant additional extensions for two more years to railroads that have installed PTC but are still testing the systems.

Railroads shouldn't wait for the deadline to complete their work on PTC, said Sarah Feinberg, head of the railroad administration.
"Every day that passes without PTC, we risk adding another preventable accident to a list that is already too long," she said in a statement.

So far, PTC is in operation on nine percent of freight route miles and 22 percent of passenger train miles, the report said.

Freight railroads have equipped 34 percent of their locomotives, installed 73 percent of their radio towers and completed 11 percent of their track segments. Passenger railroads have equipped 29 percent of their locomotives, installed 46 percent of their radio towers, and completed 12 percent of their track segments.

But progress varies considerably by railroad. For example, BNSF has equipped 4,309 of its 5,000 locomotives, but Union Pacific has equipped only 13 of its 5,656 locomotives.

The Southeastern Pennsylvania Transportation Authority, which operates commuter trains in the Philadelphia region, has equipped all its locomotives, installed all its radio towers and completed all its track segments. But nearby New Jersey Transit Rail, which carries an average of 308,000 passengers on weekdays, hasn't equipped any locomotives, installed any radio towers or completed any track segments.

The report also gave zeros in each of those categories to New York's largest commuter railroads, the Metro-North and the Long Island railroads, which each carry about 300,000 passengers on weekdays.

In 2013, a speeding Metro-North train derailed while going around a curve in the Bronx. Four people were killed and more than 60 injured. The National Transportation Safety Board said the accident could have been prevented if PTC had been in operation.

The report is based on information supplied by the railroads.
The report "is an overall summary that does not convey the progress we have achieved," said Nancy Snyder, a spokeswoman for New Jersey Transit. She noted that the railroad has acquired spectrum rights, equipped four "prototype vehicles" for testing and installed five antennas in a demonstration area, among other actions.

Beth DeFalco, a spokeswoman for the Metro-North and Long Island railroads, said the railroads have done extensive work on PTC and hope to see benefits from the technology as soon as next year.
The NTSB has urged railroads to install positive train control or earlier train control technologies for more than four decades. The board says that over that time it has investigated at least 145 PTC-preventable accidents in which about 300 people were killed and 6,700 injured.

More recently, the board has said PTC could have prevented the head-on collision of two BNSF trains in June near Panhandle, Texas. Three railroad employees were killed in the crash. The technology also could have prevented the derailment of a speeding Amtrak train in Philadelphia last year. Eight people were killed and over 200 injured in the crash.

Commuter railroads have spent $950 million on PTC so far, but the total cost is estimated to be at least $3.48 billion, said Richard A. White, acting president of the American Public Transportation Association. The White House requested Congress provide $1.25 billion in the coming 2017 federal budget year to help commuter railroads with PTC; House and Senate spending bills allocate only $199 million.

"Despite this funding dilemma, the industry is moving forward with this top safety priority," White said in a statement.
Fire21 is online now   Reply With Quote
Sponsored Links
Advertisement
 
Old 08-17-2016, 06:49 PM   #2
mopac
Dispatcher
 
mopac's Avatar
 
Join Date: Feb 2011
Location: Missouri
Posts: 1,905
Scales Modeled: HO mainly
Only way the railroads will get it done is to set a date and if not 100% PTC
shut them down until they are 100%. Govt does not let me slide on anything.
Right now railroads know they will get extensions so why conform.
mopac is online now   Reply With Quote
Old 08-17-2016, 08:44 PM   #3
mopac
Dispatcher
 
mopac's Avatar
 
Join Date: Feb 2011
Location: Missouri
Posts: 1,905
Scales Modeled: HO mainly
PTC will not prevent all accidents. I do believe it would prevent most. That head-on
wreck in Texas should never have happened in this day and age with all the tracking
electronics we have today. PTC would have prevented the Texas wreck. I know PTC
costs money, but look what BNSF lost in that wreck, 4 locomotives at over 1 million dollars each, the loss of 3 lives, and all the freight that was destroyed, all the track
that was torn up, and loss of traffic in that area for days. Many millions. Sure could
have bought some PTC units. By the way, I read the other day they never found the
3rd crewman. She was a 45 year old woman and they think she was totally consumed
by the fire. They found no trace of her and cleanup is over.
mopac is online now   Reply With Quote
Reply



Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


» Visit These Sites:
LGB World

Or Our European Train Website ModelRailForum




All times are GMT -5. The time now is 10:49 PM.


Powered by vBulletin®
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.