Model Train Forum banner

Abandoned my 3rd bridge project

4K views 21 replies 11 participants last post by  Steve25 
#1 ·
ABANDONED my 3rd bridge project is almost completed. The wooden bridge was abandoned by the RR for a better route and stronger steel viaduct. A friend of mine said, on his train trip across the US he seen lots of these abandon bridges.

George


Iron Bridge Beam Metal Room


Geological phenomenon Infrastructure Road Rock Slope
 
See less See more
2
#9 ·
Thanks John. The 2nd part of the abandon bridge project. A fire broke out in the grasslands next to the RR tracks near the steel viaduct. The Janesville fire department quickly extinguished it. I installed very small LEDS in the light bar and ditch lights of the fire truck. Their only the size of a pencil point but are very bright.

George

Geological phenomenon Vehicle Scale model Landscape Soil
 
#10 ·
I also thought you had given up in frustration. Glad to see I was mistaken! Very nice work.
 
#15 ·
#18 ·
Get some more fire trucks and simulate your abandoned trestle on fire? :D
Some well placed lights, you can even get a hook and ladder in that scene. If there is an access road by the trestle.
 
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top