This will be my first model railroad. I did put an HO oval on a piece of 4x8 once when my children were young that the Christmas tree centered in, but I considered that a toy train. My, how things have changed in the last 30 + years.
When I was a child, my father started but never completed the Central Midland. I wanted the GG&N. He won the discussion. I made up my mind 47 years ago that I would build one someday. That day has come. It is probably too much for a first timer, but this what I want. We will see.
I spent the first 2 months reading all I could while redesigning the original Atlas plan. This includes 22 minimum radius, less than 3% grades, semi-portable, reduced busy look, DCC, and completely automated computer contol.
I am not into operations, so the design is to display and let 'em run. Ultimately, I hope to have 2 trains, running in opposite directions, on each mainline and a local freight interspersing between both mainlines. With the mountain area covering half the mainlines, it should be quite fascinating to watch. With three passing tracks and computer control I think it can be possible.
I started construction 2 months ago. Please look at the pictures and give your experienced opinions. I may have gone too far already to correct any serious problems. The track is not tested and no scenery is done yet. This is my last chance to fix a poor plan.
When I was a child, my father started but never completed the Central Midland. I wanted the GG&N. He won the discussion. I made up my mind 47 years ago that I would build one someday. That day has come. It is probably too much for a first timer, but this what I want. We will see.
I spent the first 2 months reading all I could while redesigning the original Atlas plan. This includes 22 minimum radius, less than 3% grades, semi-portable, reduced busy look, DCC, and completely automated computer contol.
I am not into operations, so the design is to display and let 'em run. Ultimately, I hope to have 2 trains, running in opposite directions, on each mainline and a local freight interspersing between both mainlines. With the mountain area covering half the mainlines, it should be quite fascinating to watch. With three passing tracks and computer control I think it can be possible.
I started construction 2 months ago. Please look at the pictures and give your experienced opinions. I may have gone too far already to correct any serious problems. The track is not tested and no scenery is done yet. This is my last chance to fix a poor plan.