Model Train Forum banner
1 - 5 of 5 Posts

· Registered
Joined
·
97 Posts
Discussion Starter · #1 ·
Quick question:

I just laid out the track bed for my main line and plan on installing a dcc setup on my layout. In most of the articles I have read it states that at this point, before the track is layed, you are suppose to drill a 1/2 inch hole directly under the turnout so that a switching machine can be installed underneath to switch the turnout.

IS this correct? Just making sure before I drill a hole into my track bed.

Thanks in advance.
 
1 - 5 of 5 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top