Model Train Forum banner

1 - 6 of 6 Posts

·
Registered
Joined
·
9,553 Posts
They must have been working on it for some time, considering the big ramp they made!
Assuming the ramp wasn't already there for some reason; if the fill is available, one operator in a bulldozer could lay that down in a an hour or so. Judging from the position of the loco, though, I'd say it was just a quick clearing and leveling job.
 
1 - 6 of 6 Posts
Top