Model Train Forum banner
1 - 10 of 10 Posts

· Registered
Joined
·
215 Posts
Discussion Starter · #3 ·
I want to see a photograph showing your whole layout, it must look amazing... Nice work and nice locomotives
I cant show it in one pic. Here are some to hopefully give you an idea of the overall layout
this is looking down no name river, J&M short line is to the right. the mai line is along the tree line on the left
[URL="
[/URL]

Here is Clifton Forge station and a small part of the yard.
[URL="
[/URL]

Clifton Forge yard.
[URL="
[/URL]

Here are some overall pics
[URL="
[/URL]

[URL="
[/URL]

[URL="
[/URL]

Hopfully this will give you an Idea of what I have.
Les.
 

· Registered
Joined
·
215 Posts
Discussion Starter · #9 ·
That was exactly what I was looking for! What a cool way to show your layout too... Almost took out that signal light :laugh:

How long did it take you to build that masterpiece?
Would you believe 20 minutes?.........................OK maybe that's a stretch. How about 2 years of planning with pencil & paper and started in 96 by preparing the building. I am still working on it, not the building but the layout. If you look closely at the pics you can see a track below the layout. Not the hidden yard which is about 12" below the layout but below that. This is a mine run I call it Crooked Creek. There is 3 mines and a timber area to be serviced. It takes 18 coal cars for that run plus whatever the timber operation requires at that time.
Les
 
1 - 10 of 10 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top