Don, My plowed fields are real dirt. I used a 50/50 mix of Elmer's and water to harden the "soil". Natural color and a VERY LOW COST. Much of my detail, trees, ground cover, ect, is all natrual material. Saves me money to buy more train stuff.
The furrows of the field will be determined by the scale used on the layout.