Model Train Forum banner
1 - 9 of 9 Posts

·
Registered
Joined
·
109 Posts
Discussion Starter · #1 ·
I'm wondering how you all hold your track in place temporarily while you are designing and testing new layouts.

Setting up a new yard and want to test out various formations.
How do you hold flex track and switches in place to test out the layout?

(We're using foam over plywood sheet / code 100)

Thanks -
~Kingred
 
1 - 9 of 9 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top