Joined
·
2,141 Posts
Wel I have decided o redo up to 60% of my current layout. The hill will loose the climb with the 15 R turn, that will become an 18 R turn. Still no the best but the largest that I can fit. The track with the Amtrack will now run to the other side of he 4x8 sheet The town on one side of he bridge will be expanded by 4 feet. Ill turn into a rail yard with a transfer table. I would also like to add a more modern grain elevator to the one that exist.
Attachments
-
140.3 KB Views: 251
-
128.5 KB Views: 249
-
120.8 KB Views: 230
-
144.3 KB Views: 227
-
121.6 KB Views: 252