Model Train Forum banner
1 - 1 of 42 Posts

· Registered
Joined
·
324 Posts
Use the existing bench on the right as stub-end staging or a large industry like a papermill or refinery. Mainline runs on the big rectangle. Then you can also ditch the swing / duck / lift section...
i think beachbum has it right about the duckunder,that was the first thing that came to mind when i looked at you plan. if you want to keep all that yard for your first layout, just plan on doing it later. get the main line and a couple of sidings in so you can run trains :)
 
1 - 1 of 42 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top