Model Train Forum banner
1 - 3 of 3 Posts

· Registered
Joined
·
1,176 Posts
Discussion Starter · #1 ·
OK going to join the HO scalers here finally with some construction project this winter.

I already have the lumber so there is no backing out, and most of the track is in the mail :)

Anyways I like this plan because of all the different levels, but one thing it did not have was a hidden station, so I added that. It does also not have an area for loco service but I think I can live with that for now.

Here is the artist rendering from the book:



Here is my modified plan:



The plan is to use M tracks and a 6021 for digital control and later computer added.

Only concern is putting in the river as the first reversing loop (and hidden station tracks) must be UNDER the river bed. I guess the river will have different elevated sections as well to cover the tracks below. I figure I need about 3.5" of clearance, maybe 4" to have trains, track and 3-4mm of cork roadbed underneath.

Thanks for any comments or suggestions.
 
1 - 3 of 3 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top