Model Train Forum banner

1 - 20 of 20 Posts

·
Registered
Joined
·
399 Posts
Discussion Starter #1
hey all, i added a grain building and started ballasting the track! ballast takes a long time! got some yard operations going and three trains running. i have to say..........limited as it may be, i am having a blast with the bachmann DCC. my bachmann engines have broken in and are much more quiet now. i stopped by my lhs and he does not have the programming set up yet to set my cv's - 2 or 3 weeks. next building - a coaling station for coal cars?????

it never ends:D

this vid is ten minutes - low light to see layout lights - sunrise run?

http://www.youtube.com/watch?v=ZqukwE2mZD0
 

Attachments

·
Registered
Joined
·
266 Posts

·
Registered
Joined
·
2,138 Posts
Is that the Walther's Farmer's CoOp. I have one that is almost identical but was missing the lean-to on the side, it was an missing parts special. Great kit considering that it had the elevator, track side warehouse and a scale house included.
 

·
Registered
Joined
·
163 Posts
Did you paint it red or did it come like that out of the box?
Eventually I'll buy this kit and want to paint it to simulate tin sidings, then apply weathering.
 

·
Registered
Joined
·
163 Posts
As they were out of the red grain elevators, I ordered this one.



Hopefully it is complete and not a missing parts discount like my ADM grain elevator was.
 

·
Registered
Joined
·
399 Posts
Discussion Starter #19
1 - 20 of 20 Posts
Top