Joined
·
399 Posts
hey all, i added a grain building and started ballasting the track! ballast takes a long time! got some yard operations going and three trains running. i have to say..........limited as it may be, i am having a blast with the bachmann DCC. my bachmann engines have broken in and are much more quiet now. i stopped by my lhs and he does not have the programming set up yet to set my cv's - 2 or 3 weeks. next building - a coaling station for coal cars?????
it never ends
this vid is ten minutes - low light to see layout lights - sunrise run?
http://www.youtube.com/watch?v=ZqukwE2mZD0
it never ends
this vid is ten minutes - low light to see layout lights - sunrise run?
http://www.youtube.com/watch?v=ZqukwE2mZD0
Attachments
-
170.2 KB Views: 149