Ok , its all in the title. Maybe a jan , feb start date. Basement layout , 3 or 4 sheets of plywood. Not sure on the exact dimensions. I may revisit my old layout, or add to it and expand. The old was dismantled but i have the tops minus the buildings and tall scenery. I like old school stuff and operating accessories. Real life train reproduction isnt high on my list. Fun and loaded with crap is a better way to describe what I want.
Questions, are:
Do people still use legacy stuff? Or tmcc stuff? I have both , never used. Or Is it all Bluetooth stuff now? And what will legacy or tmcc run with? I have engiens to run on both ( not a lot) and the controlers. I have a ton of post war stuff and some pre war. Batteries will probably need replacing on the higher tec stuff.
Track: I still like the old stile 3 rail. I have it , and bigger radius stuff. Plus plentiful switches. Worth it to upgrade or not?
Keep it conventional or add so I can do other stuff later. Or a mix of a middle 2 loops conventional and one loop with newer tec?
Options, opinions, thoughts or ridicule is welcome.
Questions, are:
Do people still use legacy stuff? Or tmcc stuff? I have both , never used. Or Is it all Bluetooth stuff now? And what will legacy or tmcc run with? I have engiens to run on both ( not a lot) and the controlers. I have a ton of post war stuff and some pre war. Batteries will probably need replacing on the higher tec stuff.
Track: I still like the old stile 3 rail. I have it , and bigger radius stuff. Plus plentiful switches. Worth it to upgrade or not?
Keep it conventional or add so I can do other stuff later. Or a mix of a middle 2 loops conventional and one loop with newer tec?
Options, opinions, thoughts or ridicule is welcome.