Joined
·
3,090 Posts
I like the cases that Tworail has on his walls. I have too many train in boxes. it would be great to have them on display on the wall.
I was thinking about a way to have the shelves lift out . Then set the whole section, Train track and shelf down in the layout. This would be a fast way to change out the trains. Drop them in and drive them off the shelf.
Has anyone done something like this before?
I was thinking about a way to have the shelves lift out . Then set the whole section, Train track and shelf down in the layout. This would be a fast way to change out the trains. Drop them in and drive them off the shelf.
Has anyone done something like this before?