Joined
·
6,857 Posts
Yep, change some of them weekly. I try to run 75 to 100 locos throughout the year. Each operating session I will log in the locos that are running for that session. I usually have 5 consists running during an operating session. At the end of the year I will know which locos saw some action.Nice looking. :thumbsup: Boy you make me feel lazy. You change the trains your running on the layout every week. Mine sit there for months before I change what I’m running.![]()
The run em on a shortline from Pendelton to Walla Walla. Don't need anything fancy for that region.Looks great, but I wonder where UP got those old heavyweights to run with the F3's.![]()