Very nice ! !
I wish I had that kind of room todo the entire prototype in, would be awesome to model every town and area it would go thru, but that would be in HO.
O is very room consuming, nice work.
Kevin
So far I have an upper double track line,( 11 below the ceiling), with a siding. A double main line, (videos just above door level), with three sidings. Both just roughed in. Hope to complete these this winter and add the main bench work, at 48". All three levels will joined with long grades and there will also be reversing loops. My goal is to complete all the trackage and have it all running by spring. Scenery the following winters. I plan on using Legacy and DCS. Been having trouble with the two systems to date but hope to work it out this winter.
Cheers from Canada EH.
1 - 6 of 6 Posts
This is an older thread, you may not receive a response, and could
be reviving an old thread. Please consider creating a new thread.
A forum community dedicated to model train owners and enthusiasts. Come join the discussion about brands, various scales, repairs, storage, displays, reviews, accessories, classifieds, and more!